Flood Impacts |
21.3 | RECORD FLOODING CAN BE EXPECTED. |
17.0 | MODERATE FLOODING IN THE PHARR YARNS MILL AREA AND IN THE CRAMERTON AREA MAINLY SOUTH OF THE SOUTHERN RAILROAD TRACKS WILL BE OBSERVED. |
16.5 | THE POWER TO THE TOWN OF MCADENVILLE WILL BE SHUT DOWN AND THE CRAMERTON FIRE DEPARTMENT WILL BEGIN TO FLOOD. |
15.5 | SOME FLOODING IN THE CRAMERTON AREA SOUTH OF THE SOUTHERN RAILROAD TRACKS WILL BE OBSERVED. |
14.0 | THE BASEMENT OF PHARR YARNS WILL BEGIN TO FLOOD. |
13.0 | HOMES ALONG RIVERSIDE DRIVE IN CRAMERTON FLOODED WITH 2 FEET OF WATER. |
12.0 | WATER WILL APPROACH THE FIRE DEPARTMENT BUILDING IN CRAMERTON AND THE PARKING LOT BEHIND THE DRUG STORE WILL BE FLOODED. |
11.5 | FLOODING ALONG RIVERSIDE DRIVE BETWEEN 5TH AND 6TH STREETS IN CRAMERTON WILL OCCURR. THE PUMPING STATION AT PHARR YARNS MILL WILL ALSO BEGIN TO FLOOD. |
10.0 | THE RIVER WILL OVER FLOW ITS BANKS AND BEGIN TO FLOOD RIVERSIDE DRIVE NEAR 5TH AND 6 TH STREETS IN CRAMERTON. |