Flood Impacts |
30.0 | MAIN STREET, ROUTE 19, 400 FEET FROM THE RIVER GAGE IS FLOODED. |
26.5 | TREMENDOUS PROPERTY DAMAGE TO THE ENTIRE BUSINESS DISTRICT IN WESTON. |
25.0 | WATER ENTERS THE WESTON POLICE DEPARTMENT. THE LEFT BANK SIDE OF THE END OF SECOND STREET BRIDGE IS FLOODED. |
24.5 | THE PARK NEAR THE LEFT BANK END OF SECOND STREET HIGHWAY BRIDGE IS FLOODED. |
24.0 | THE FOOT OF THE FIRST STREET BRIDGE ACROSS WEST FORK ABOUT 0.1 MILES UPSTREAM FROM THE RIVER GAGE, AND THE ROADWAY 60 FEET UPSTREAM FROM RIVER GAGE IS FLOODED. |
22.3 | BASEMENT FLOODING IN NUMEROUS BUSINESSES ON WEST SECOND STREET AND THE WEST SIDE OF MAIN STREET. ALSO, THE JUNIOR HIGH BEGINS TO FLOOD. |
22.0 | HOMES ALONG RIVER AVENUE, 300 FEET DOWNSTREAM FROM THE RIVER GAGE, BEGINS TO BE AFFECTED BY HIGH WATER. SOME PROPERTY DAMAGE. |
21.7 | TOP OF RIVER BANK FLOODED, 300 FEET D0OWNSTREAM FROM THE RIVER GAGE. |
20.5 | TOP OF RIVER THE BANK IS FLOODED, 100 FEET UPSTREAM FROM THE RIVER GAGE (RIVER AVENUE) |
20.1 | WATER IS OVER RIVER AVENUE, ABOUT 200-400 FEET DOWNSTREAM FROM THE RIVER GAGE. SOME HOMES ARE ALSO FLOODED. |
20.0 | LOWER PORTIONS OF THE RAILROAD BRIDGE, 0.8 MILES DOWNSTREAM FROM THE RIVER GAGE. |
17.0 | THE CENTER LINE OF RIVER AVENUE ALONG THE RIVER, 300 FEET DOWNSTREAM FROM THE RIVER GAGE. |
15.0 | WATER STARTS TO OVERFLOW LEFT BANK ONTO RIVER AVENUE, FROM ABOUT 200 FEET DOWNSTREAM TO ABOUT 1 MILE DOWNSTREAM FROM THE RIVER GAGE. |