Flood Impacts |
14.0 | Major Flood Stage.
Patrol levees and storm sewer outlets through levees. |
12.0 | Moderate Flood Stage...City starts to mobilize.
Flooding of portion of sanitary sewer system.
Bankfull Stage. |
11.0 | City is mobilized to patrol dikes. |
10.0 | Flood Warning Stage...minor.
Baseball field in Wells Park floods. |
9.0 | Minor flooding at Wahpeton sewage pump station. |
8.5 | Forecast Service Stage |
8.0 | Ottertail river starts to overflow downstream of Highway 75 bridge.
This breakout flow will enter the Red river 600 feet downstream of the gage.
As stage rises...water fans out and floods the entire east side of bottom lands.
SOme water enters the Red near the cableway. |
7.0 | Close Storm Sewer Outfalls.
River enters Wells Park in Breckenridge. |