Flood Impacts |
2533.0 | Coolidge Dam is overtopped. Flows of over 120000 cubic feet per second will cause massive bank erosion and damage near Winkleman. |
2526.0 | Homes threatened on the southeast side of Winkleman. Resulting backup of San Pedro River threatens numerous homes near Dudleyville. |
2523.0 | Highway 77 bridge approaches overtopped. |
2521.0 | Water begins to backup into the San Pedro River towards Dudleyville. Highway 77 bridge bottom is reached. |
2518.0 | Highway 77 bridge abutments are threatened due to debris and bank erosion. |
2515.0 | Winkleman Flats and other parks near the river are flooded. |
2511.6 | Flow begins through the Coolidge Dam spillways. |
2511.0 | Historically, precautionary evacuations in the Winkleman Flats area have taken place. |